Based on the answers in the attached document 1. Calculate the recommend the optimal level of production for each product. A detailed answer is required. 2. Analyse the results suggesting suitable actions which the production manager should take in the short and long term. mention that remedial action could be taken to remove the bottle neck and what type of action such as ways to reduce the assembled hours but then go on to warn that if one bottle neck is removed there is a chance it can be replaced by another.